CONSULTATION
Using state of the art design tools, a YellowLite Solar sales representative will review your custom quote with you.
Enjoy Reduced Electricity Bills In Michigan
The Great Lake State has plenty of sunshine to offer and some pretty cool incentives for people who decide to go solar. Take advantage of these incentives & reduce your electricity bills.
Michigan has a State-wide 100% property & sales tax exemption for solar panels. On top of that, there is a 30% Federal Tax credit and financing options for loans up to $30,000.
Our panels and other renewable energy products come with a warranty that protects you against any possible failures of the product.
By going solar in Michigan, you will be able to cut your electricity bill and increase the value of your property. Over time, you will actually start making money by going solar. Lastly, you will make a positive contribution to a healthy environment.
From educating our consumers about solar power to designing & installing solar power systems, Yellowlite has helped over 2000 residents and businesses make the switch from traditional power to solar energy.
Call us at (216) 333-1364 or request a quote & set up a free consultation for your solar panels in Michigan. Our quote includes site assessment, financing options for your state, installation, permitting, inspection and interconnection.
The solar panel system consists of 24 SolarWorld 320 watt monocrystalline panels. The panels are 16% efficient with a 10-year product warranty and a 25-year performance warranty.
READ MOREThe state of Michigan instituted its state energy policy in regard to renewables back in 2008. This past November, the Michigan State Senate passed two bills to address two major areas of their energy policy: renewable energy and energy choice.
READ MORE
Use Our Tool to Calculate Costs of Your Solar Array & Energy Storage System
View InstallationsUsing state of the art design tools, a YellowLite Solar sales representative will review your custom quote with you.
Once you go solar, you’ll be assigned a Project Manager (PM) who will schedule a site inspection and installation plan.
Your Project Manager will review the installation plan with our design team to finalize your custom design.
YellowLite will submit your designs to your governing permit authority and your utility company for approval.
Your Project Manager will contact you to schedule your installation. Installation usually takes 1-3 days.
Once installation is complete, YellowLite will coordinate a third party inspector and your utility to approve your solar array.
Once approved your utility will replace your existing meter with a bi-directional meter allowing electricity through your house.
You are now ready to utilize the power of the sun to reduce your electric bills and your carbon footprint!